MULTIPOD BATHROOM SYSTEM
MULTIPOD is NZ’s most versatile bathroom pod system – delivering beautifully tiled bathrooms faster, simpler and more reliably for a wider range of NZ bathroom projects.
We’ve adopted proven technology used for decades in the luxury passenger ship industry to create a bathroom design that significantly reduces leaks and wet area risk.
Plus, with our pods able to be assembled without requiring external access around the bathroom enclosure, MULTIPOD can be now used for renovations and on-site assembly
More control over supply choices
Use NZ-sourced tapware, vanities, toilets and accessories
Less change to your build process
Bathroom Kits fit into your existing programme with minimal disruption.
Less bathroom rework risk
Factory-engineered bathroom components help deliver consistent outcomes.
Tiled Bathroom Shell Only Kitsets from $4000 + GST
✳︎
Fully complete tiled Bathroom kitsets from $6000 + GST
✳︎
Tiled Bathroom Shell Only Kitsets from $4000 + GST ✳︎ Fully complete tiled Bathroom kitsets from $6000 + GST ✳︎
A complete bathroom structure. Built smart. Built right
Tough single-piece bathroom base
The moulded SMC base forms the floor of the pod and is factory contoured to direct water toward the floor wastes. Its one-piece construction eliminates floor joins and the need for troublesome waterproofing membranes.
The durability of Fibreglass composite (SMC)
The base and ceiling are made from SMC - the same material used by Boeing in their 787 aircraft.
SMC is both attractive and ultra hard wearing. It provides a non-slip, hygienic, wipe clean surface that is tough, without being brittle.
Ceramic tiled wall
system
Your choice of large format ceramic tiles are bonded to full height galvanised steel wall sections. During assembly, the wall panels permanently interlock into the base and adjoining panels to create a trouble-free full wet room enclosure.
Fully free-standing steel & aluminium structure
The galvanised steel & aluminium panels forms a self supporting structure that can be transported without damage. It does not require additional site framing.
Bathroom furniture can be screw fixed direct to the walls without requiring additional support
Designed to reduce wet-area risk
Bathrooms are one of the most trade-intensive and defect-sensitive parts of a build. MULTIPOD is designed to bring more control to the bathroom enclosure before final fit-out begins.
Controlled drainage path
The contoured base directs water toward the floor & shower wastes, while the integrated wall upstand helps contain the wet area at the floor-to-wall junction
Elimination of waterproofing membranes
Waterproofing membranes are a bottleneck for many project timelines. The MULTIPOD system delivers exceptional watertightness using our single piece base and robust mechanical joins. No more waiting for membranes to dry.
Built for repeatable detailing
Once a bathroom layout is completed and approved, the same enclosure design can be repeated across multiple units to help improve consistency from one bathroom to the next
Select the delivery path that suits your project
The MULTIPOD system allows builders to select the assembly option that best suits the needs of their project
| Works | Onsite assembly | Offsite assembly |
|---|---|---|
| Site works preparation | Site works completed in the normal way through to the preline stage. All plumbing, electrical and ventilation connections installed to the perimeter of the bathroom footprint. Floor rebated by 70mm for level-entry bathrooms. | Site works are completed in the normal way up until frame stage. The main drainage, ventilation, electrical and hot/cold water feeds are installed onsite according to plans. Floor rebated by 70mm for level-entry bathrooms. |
| Delivery & timing of kitsets | Kits delivered direct to site after the site preline works have been completed. | Kits delivered to the offsite location for assembly. The assembled pods are delivered to site prior to completion of framing. |
| Enclosure assembly | Completed onsite and in location. | Completed offsite, with pods assembled on wooden pallets for ease of transport to site. |
| Electrical/plumbing connections within pod | None. | Hot/cold water and electrical connections fitted to the exterior of the pod during offsite assembly. |
| Connection to site service |
All electrical and plumbing connections are site based. During assembly, penetrations are cut into the wall panels to access the site services behind. |
Hot/cold water and electrical feeds and ventilation ducting are connected to the pod onsite. |
| Fit-out & second fit |
Completed onsite. Using either our fit-out fixtures or your own. |
Completed offsite. Using either our fit-out fixtures or your own. |
| Inspections | The completed pod is inspected onsite. |
The assembled pod is inspected offsite. The installed bathroom is inspected onsite. |
Ready to add bathroom kits and pod shells to your offer?
Explore a merchant or wholesaler partnership with MULTIPOD. We will help identify the best supply model for your customer base, product range and project opportunities.
Or call Phil on 021 915 525 if you would like to talk in person